4. Outward processing
Export of Uzbek goods for repair, processing or modernization abroad. We plan identification, processing operations, yields, deadlines, processed-product documentation and return import in advance.
8. Inward processing
Processing of foreign raw materials/components in Uzbekistan with subsequent export/re-export. We structure the process flow, yields, identification, losses, waste, residues and regime closure.
- Tolling / Processing Agreement - toll manufacturing and processing of customer-owned raw materials.
- Repair & Return / Warranty Replacement - outbound repair, warranty replacement and return of defective goods.
CONTRACT ENGINEERING - DESIGN BEFORE SIGNING
- Preamble: contract number, place, date, full legal names and signing authority.
- Scope: precise description of goods/works/services, characteristics, assortment, quantity, quality, standards, model/brand and registration/conformity details where applicable.
- HS code and unit of measure; for used machinery - service life/depreciation information where required.
- Incoterms rule and exact named place of delivery (port, station, airport, terminal, etc.).
- Delivery / works / services timeline and acceptance mechanism.
- Contract value, unit price and currency; for equipment + installation + commissioning + training + royalty, separate pricing of components.
- Payment currency, method and timing; if payment currency differs from contract currency, the conversion rate and source.
- Country of origin, place of works/services and manufacturer.
- Liability, penalties, warranty, force majeure, claims and dispute resolution.
- Banking, postal and shipment details; payer/shipper/consignee are separately identified if different from the contracting party.
- Changes are documented by amendment and the E-kontrakt data is updated where required.
- If the contract is not in the state language, account for the requirement to translate it into the state language and certify the translation as required.
RANDARA positioning: not merely “drafting a contract”, but designing contract + customs + bank + logistics + permits + risk closure as one transaction.
Source materials dated 20 September 2026. Requirements are checked for each specific transaction.
