Before payment and shipment

Investor and Large-Project Customs & Foreign Trade Support

Legal due diligence, project contracts, customs/import structuring, incentives, banking-document coordination and investor protection for projects in Uzbekistan.

Discuss your project
  • 01CUSTOMS
  • 02FOREIGN TRADE
  • 03COMPLIANCE
  • 04LOGISTICS
  • 05RE-EXPORT
  • 06BANKING DOCUMENTS
  • 07INVESTMENT PROJECTS

INVESTMENT AND LARGE-SCALE PROJECTS

  • Legal Due Diligence covering counterparty, corporate structure, contract, payment, delivery and regulatory risk.
  • Drafting/review of investment, supply, project/construction and foreign-trade agreements.
  • Import/customs structure review before procurement of equipment, machinery or materials.
  • Assessment of customs/tax incentives, exemptions and preferences against the specific legal basis.
  • Investor protection through payment, delivery, acceptance, warranty, liability, penalties and dispute-resolution terms.
  • Single-coordinator model for plants, construction, energy, oil & gas, infrastructure and logistics projects.

INDUSTRIES AND TYPICAL USE CASES

  • Industrial equipment and production lines
  • Construction materials and infrastructure
  • Energy and electrical equipment
  • Oil & gas and industrial services
  • Transport, special machinery and semi-trailers
  • Chemicals, lubricants, antifreeze and technical fluids
  • Metals, pipes, raw materials and industrial materials
  • Food, agricultural and quarantine-controlled goods
  • IT/telecom and equipment with potential dual-use risk
  • Large investment and project-supply transactions

CONTRACT ENGINEERING - DESIGN BEFORE SIGNING

  • Preamble: contract number, place, date, full legal names and signing authority.
  • Scope: precise description of goods/works/services, characteristics, assortment, quantity, quality, standards, model/brand and registration/conformity details where applicable.
  • HS code and unit of measure; for used machinery - service life/depreciation information where required.
  • Incoterms rule and exact named place of delivery (port, station, airport, terminal, etc.).
  • Delivery / works / services timeline and acceptance mechanism.
  • Contract value, unit price and currency; for equipment + installation + commissioning + training + royalty, separate pricing of components.
  • Payment currency, method and timing; if payment currency differs from contract currency, the conversion rate and source.
  • Country of origin, place of works/services and manufacturer.
  • Liability, penalties, warranty, force majeure, claims and dispute resolution.
  • Banking, postal and shipment details; payer/shipper/consignee are separately identified if different from the contracting party.
  • Changes are documented by amendment and the E-kontrakt data is updated where required.
  • If the contract is not in the state language, account for the requirement to translate it into the state language and certify the translation as required.

RANDARA positioning: not merely “drafting a contract”, but designing contract + customs + bank + logistics + permits + risk closure as one transaction.

Source materials dated 20 September 2026. Requirements are checked for each specific transaction.

Related services

Talk to our team